(1)The solid wood floor should be laid at the end of the construction period, and cross operation is not allowed. After laying, it should be polished and painted as soon as possible. In case the floor is dirty or deformed by moisture.

(2)The solid wood floor should be unpacked before laying and placed on the spot for 1 ~ 2 days to adapt to the new environment, so as to prevent expansion and contraction deformation after laying.

(3)When laying, moisture-proof measures must be taken, especially in damp places such as the bottom floor. Moisture-proof measures can be coated with moisture-proof paint, covered with moisture-proof film, and used as bedding treasure.

(4)The keel should be flat and firm, and it should not be fixed with cement. It is best to use expansion bolts and nails.

(5)The keel should be made of wood such as larch and Liu 'an with strong nail holding power. The water content of keel or wool floor should be close to that of wood floor. Keel spacing should not be too large, generally not more than 40cm. Both ends of the solid wood floor should be fixed on the keel, and it can't be left empty, and nails must be nailed on each keel. Do not use water-based glue.